Services
Routine work.
Design, installation and testing of all sizes of LPG storage installations.
LPG pump test rig able to test and monitor LPG pumps with up to 18kw motors.
Measuring accuracy of LPG pumps and dispensers
Investigation of LPG installation performance
Fuel storage
Installation and design of all types of fuel storage
Assessment of fuel storage installations in accordance with the Environment
Agency requirements
DSEAR
Assessment of proposed and existing installations to confirm compliance
with the Regulations.
Establishment of HAC (Hazardous Area Classifications).
Electrical installations
Design, installation and assessment of electrical installations for all
types of hazardous installations.
Special Projects
Millennium flame adjacent to Tower Bridge.
Design, testing, documentation of procedures and operation of the flame
that entered the Guinness Book of Records as the largest decorative flame.
Jubilee Beacon
Design, testing and documentation of procedures for the flame at the end
of the Mall in 2002.
|
||||||||||||||
|
||||||||||||||
|
||||||||||||||
|
||||||||||||||
Home | About Us | Services
| Contact Us Adapted from a design by Templatesbox |
||||||||||||||